GRC线条这种具有功能性的装饰建材,GRC线条对施工环境的条件是有一定要求的,那么GRC线条安装的要求有什么呢?GRC构件厂家一起来往下看一看!
GRC line this functional decorative building materials, GRC lines have certain requirements for the construction environment, so what are the requirements of GRC line installation? GRC component manufacturers look down to see it!
1、不能阴雨天气情况下进行施工。
1. Construction can not be carried out under rainy weather conditions.
2、在大风和高温的情况下、阳光直射的墙面上施工,防止GRC构建失水过快而出现毛细裂缝。
2, in the case of high winds and high temperatures, direct sunlight on the wall to prevent GRC from building water loss too fast and capillary cracks.
3、施工环境的风力比较大的情况下。
3, the wind of the construction environment is relatively large.
4、在施工GRC线条,不要进行其它的施工。
4, in the construction of GRC lines, do not carry out other construction.
5、施工墙面以2米的靠尺检查,最大偏差应小于4mm;超差部位应修补。
5. The construction wall should be checked with a 2 meter gauge. The maximum deviation should be less than 4mm, and the oversize location should be repaired.
6、施工现场的环境温度和基层墙体表面温度在施工及施工后24小时内不得低于5℃,一般在5-35℃环境下施工。
6. The ambient temperature of the construction site and the surface temperature of the base wall shall not be below 5 degrees within 24 hours after construction and construction, and generally be constructed at 5-35 degrees.
7、施工时要保持墙面的基本干燥和整洁。
7, keep the wall basically dry and tidy during construction.
8、施工完后避免雨水的冲刷,应加以保护。
8, avoid rainwater scouring after construction, and should be protected.
9、施工时要随时掌握天气变化,做出施工调整。恶劣天气下严禁施工。
9, during construction, we should keep abreast of changes in weather and make adjustment in construction. Construction is strictly prohibited under bad weather.
10、应随时掌握后三天的天气情况,如若出现下雨天严禁施工。
10, we should keep abreast of the weather conditions after three days. If there is a rainy day, no construction is strictly prohibited.